Virden Municipal Building and Auditorium
Acclaimed by Virden’s The Empire-Advance as one of the finest and best equipped opera houses in Western Canada, the Auditorium has a handsome interior and superb acoustics. It was constructed in 1911–12 as an addition to the existing fire hall by local contractor William Thomas Manser from designs by noted Brandon architect William A. Elliott.
The “Aud” opened on February 29, 1912. As well as serving as the home of the Virden Dramatic and Operatic Society and the Virden Orchestra, it soon became the social and entertainment centre for the performing arts in western Manitoba. The unusual combination of municipal offices, courtroom and theatre has made this building a provincial landmark. After the demolition of the fire hall, the Auditorium was restored through community efforts during 1982–83. The Municipal Building was subsequently renovated by the Town of Virden.
Édifice municipal et auditorium de Virden
Consacré par The Empire-Advance comme étant l’une des meilleures salles d’opéra et parmi les salles les mieux équipées de l’ouest du Canada, l’Auditorium est doté d’un bel intérieur et caractérisé par une acoustique hors pair. L’édifice a été construit en 1911 et 1912 comme annexe de la caserne d’incendie, par l’entrepreneur local William Thomas Manser, à partir de plans conçus par l’architecte de Brandon William A. Elliott.
L’« Aud » a ouvert ses portes le 29 février 1912. En plus d’abriter la Virden Dramatic and Operatic Society et l’orchestre de Virden, l’auditorium est bientôt devenu le centre social de loisirs et d’art dramatique de l’ouest du Manitoba. La combinaison inhabituelle de bureaux municipaux, de salle d’audience et de théâtre font de cet édifice une curiosité provinciale. Après la démolition de la caserne d’incendie, l’Auditorium a été rénové grâce aux efforts de la collectivité en 1982 et 1983. L’édifice municipal a par la suite été rénové par la ville de Virden.